Teams Now Forming for Officer Booth Replacement Services at President's Park, DC
Opportunity Details
End Customer:
• INTERIOR > NATIONAL PARK SERVICE
Place of Performance:
• Within 50 miles of Ellipse Rd NW, Washington, DC 20502, USA
Teaming Partner Requirements
Industry/NAICS Code:
• 236220 Commercial and Institutional Building Construction
General Details on this Teaming Opportunity
The National Park Service, Department of Interior, (NPS) will be soliciting proposals for construction firms having the capabilities to perform a construction project to replace two existing security booths and refurbish two existing vehicle entry gates at the White House secured facility in Washington, D.C., as described below. This construction project has been classified at the "Secret" level. Potential offerors shall be required to have security clearance and the ability to safeguard the information under the project. The construction project is to replace two existing security booths and refurbish two existing vehicle entry gates at the White House secured facility in Washington, D.C. The project involves the demolition of two existing officer booths and the construction of new replacement booths. Exterior walls are of concrete with steel framing clad with limestone and granite veneer. The roof structure is steel framing with a combination tern-coated standing seam metal roof and a tapered EPDM membrane roof. Windows require "special" glazing. Two existing vehicle entry gates are to be refurbished. The work for these entry gates involves removal of two gate leafs at each location and refurbishment at an off-site location. Refurbishment includes stripping the lead-based paint, repairing gate hinges and locking mechanism, other miscellaneous repairs and repainting with a high performance epoxy coating paint system. Once the off-site refurbishment is complete, the gate leafs are to be reinstalled. The on-site work environment is a high security controlled area requiring close day-to-day coordination with government officials to ensure the integrity of the secured site. All contractor personnel will undergo background investigations for access to the site, and all potential contractors (at any tier) and their personnel requiring access to construction documents shall be required to hold a security clearance at the "Secret" level. The contractor's successful performance and execution of this construction project will be challenged by several steady and life-of-project constraints and challenges such as maintaining a clean, orderly, and organized work site in constant and strict adherence to all regulatory and daily oversight from the highest levels of the government at a facility that has government business conducted on a daily basis. Another requirement will be to provide and coordinate all transportation, hauling, and material deliveries within a secure, constrained work site in a heavily congested urban area. The work environment and scheduling of work and deliveries will be subject to temporary work stoppages due to security requirements while government officials and visiting dignitaries are entering or leaving the facility as well as special events that will require temporary work stoppages up to a week at one time.
Learn more about this Teaming Opportunity published on GovWin - the professional network where businesses exchange opportunities, resources, and information, to win more business, expand capabilities, and increase profitability.
Follow new Business Opportunities, Resources, and Assets on Twitter:
Business Opportunities
Resource Availability and Demands
New Corporate and Individual Members
All Activity
